New energy vehicle charging station solution1、 Industry background 2、 Construction of DC charging station 3、 Analysis of DC charging station structure and related industries 4、 Production, R&D and test plan of charger and on-board charger 1. Analysis of charging mode of charging station 2. Working principle of charger and charging pile ① Working principle of high-power pure electric vehicle charger ② Working principle of AC charging pile 3. Charger and charging pile test requirements ① The rectifier and filter links include the following tests: (AC DC) ② High-frequency DC-DC power converter includes the following tests (direct to direct DC-DC) 4. Instrument configuration scheme ① Typical configuration of oscilloscope: ② Typical configuration of power analyzer ③ DC load: ④ AC power supply: ⑤ Thermal imager: ⑥ Power quality analyzer 5、 Charging station maintenance test plan 1. Power quality test ① Power quality requirements ② Impact of charging station on power quality ③ Power quality analysis and configuration scheme ④ Features of FLUKE power quality analyzer: 2. Infrared thermal imaging test ① The infrared thermal imager can detect and prevent the following faults: ② Diagnosis method and judgment basis of infrared detection ③ Configuration scheme of infrared thermal imager ④ Features of FLUKE thermal imager 3. Grounding resistance test ① Why should we ground? ② The definition and function of grounding, and what hidden dangers can be avoided by checking grounding? ③ What is the grounding resistance? ④ Configuration scheme of grounding resistance tester 4. Other electrical test tools |